pl020l_nowy_sacz.doc

(924 KB) Pobierz
URBAN ATLAS METADATA

URBAN ATLAS – LUZ DELIVERY REPORT

LUZ

Nowy_Sacz_PL

 

GENERAL INFORMATION

Area of product

448,001  km²

 

Format (geodatabase esri) 

Ok

 

SOIL SEALING cover and projection

Ok

 

COTS validation

Ok

 

 

Coordinate system reference

Projection: UTM 34

Central Meridian: 21°

Latitude of Origin: 0°

False Easting: 500000,00

False Northing: 0,00

Ellipsoid: WGS84

 

IMAGE data used

Satellite &

Sensor

Image Name

Date (y/m/d)

Remark (e.g. clouds)

Spot 5 10 m

50772490610180951282J6 (XS)

2006/10/18

Production of Pan-sharpening images by SIRS

Spot 5 2,50 m

50772490610180951262B6 (P)

2006/10/18

 

Ancillary data used (thematic data, satellite images, aerial photos, city maps)

Id.

Data source/type

 

Title

(if relevant)

 

Date de production

(y/m/d)

 

Scale

(spatial detail)

Remark

Google Earth

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CAPI/ DIGITAL CLASSIFICATION

Photointerpreter(s)

Name/surname

interpretation

start (y/m/d)

end (y/m/d)

Remark

Lecocq Aurélien

Sladkowski Audrey

Bitschene Antoine

11/03/17

11/03/30

 

 

 

 

 

 

 

Internal quality control

Internal quality check

Date of control

(y/m/d)

Result

Remark (errors, corrections, etc.)

Crépin Anne

11/03/31

OK

Lot of sand banks along  the rivers.

 

 

 

 

 

 

Quality assesment

Internal quality check

Date of control

(y/m/d)

Result

Remark (errors, corrections, etc.)

IGNFI

11/03/23

ok

 


 

 

 

CONFUSION MATRIX

 

Urban strata accuracy calculation

The sample population is that of the entire LUZ and non urban classes are aggregated in class 600.

The main advantage of this method is to provide both omission and commission errors on the urban strata (omission - commission class 1xx / class 600).

 

 


 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 
 
TOPOLOGICAL QUALITY CHECK

 

The topological quality check of all the LUZ was based on the same rules ( cf diagram).

·         Thematic QC on the CAPI phase,

·         Creation of Arcinfo’s Topology,

·         Geometric check and validation of Geodatabase’s Topology.

However, in some cases, especially in huge LUZ, the geometric check and arcgis’s topology failed.

The main cause was the size and shape of a very large and complex polygon composed of roads (code 12220).

So, to avoid this problem, SIRS creates on those LUZ a 10 km size grid which splits this huge polygon in smaller ones.

Only the 12220 code roads are split using this method.

After this operation, the geometric and topology check passed successfully.

 

 

Internal quality check

Date of control

...

Zgłoś jeśli naruszono regulamin